US$ 249.50
Solid recovered fuels. Quality management systems. Particular requirements for their application to the production of solid recovered fuels Ingestion-build-109673 Product designers/architects
$136.00
Description
Product designers/architects
Strategy for risk reduction
determination of the longitudinal wave velocity vL
BS 4185-2 covers all the requirements
Solid recovered fuels. Quality management systems. Particular requirements for their application to the production of solid recovered fuels Ingestion-build-109673 Product designers/architects1 Scope This European Standard specifies requirements for the quality management system for the production and trade of solid recovered fuels from the reception of waste(s) up to the delivery of solid recovered fuels (Figure 1). Figure 1 Quality management systems within the solid recovered fuels chain
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 154.50
US$ 49.00
US$ 519.50