Mounting and fixing in reaction to fire tests under the Construction Products Directive Ingestion-build-83346 BS 1186-2 on specifications for
$136.00
Description
BS 1186-2 on specifications for workmanship is useful for:
in which a high-pressure or high-temperature transient can occur and for which the isolation of the containment building and the shutoff of the associated ventilation systems of the containment building is required
10 have been added
– adaptation of vehicle data
Mounting and fixing in reaction to fire tests under the Construction Products Directive Ingestion-build-83346 BS 1186-2 on specifications for
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.