Specification for installation, exchange, relocation, maintenance and removal of gas meters with a maximum capacity not exceeding 6 m3/h - Medium pressure (2nd family gases) Ingestion-build-82396 for example a local council
$174.00
Description
for example a local council
Additional markings required relating to maximum patient weight and safe working loads
The PAS sets out detailed recommendations by referring to existing national and international industry standards
See BS 1192‑4 for definitions
Specification for installation, exchange, relocation, maintenance and removal of gas meters with a maximum capacity not exceeding 6 m<sup>3</sup>/h - Medium pressure (2nd family gases) Ingestion-build-82396 for example a local councilWhat is this standard about? It exists to help gas meter installers meet the requirements of 16 UK and European regulations, including the Gas Safety (Installation and Use) Regulations. Its been updated to align with the UK Governments mandate for the installation of gas smart meters in all homes by 2020. Who is this standard for? It will be used by gas meter installers and a range of other professionals within the gas industry, including: Training
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.