Railway applications. Track. Acceptance of works - Works on ballasted track. Plain line, switches and crossings Ingestion-build-63436 BS EN 61158-4-18 assists you
$136.00
Description
BS EN 61158-4-18 assists you with:
supplementary data
marking construction
the system needs to be able to transport fluids throughout its operating life without blockages
Railway applications. Track. Acceptance of works - Works on ballasted track. Plain line, switches and crossings Ingestion-build-63436 BS EN 61158-4-18 assists you1 Scope This European Standard specifies the minimum technical requirements and the tolerances for the acceptance of works on ballasted track situated on plain line and on switches and crossings and rail expansion devices, as part of the track, for 1 435 mm and wider track gauge railways, concerning construction of new track, track renewal and track maintenance. More particularly, this standard gives the requirements for the documentation of work
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.