ODA - EWS Maroon/Yellow - Triple Pack E cannot-cancel for use at the East
$129.00
Description
for use at the East Cannock Colliery in Staffordshire
Named ‘Severn Valley Railway’ in 2016
two fitted with additional ‘Greedy Boards’
* Two style of door operating equipment covers
ODA - EWS Maroon/Yellow - Triple Pack E cannot-cancel for use at the EastIn the early 1980s, British Rail's shift to an air braked network created logistical challenges for the Ministry of Defence (MoD), whose depot sidings had sharp curves that could not accommodate newer, long wheelbase wagons. To solve this, 50 vacuum braked, 12 foot wheelbase "Pipe" wagons (built in 1961 under Lot 3335 to Diagram 1 462) were selected for conversion. Their drop sides were ideal for palletised loads. Modified at Shildon works in 1983
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 149.50
US$ 164.50